|
**Previous commits of the project should have been already analysed (R5)** using Static Energy Consumption Estimation tool in order for the service to retrieve them from the database. This is performed by placing {“commit”:commit-id} in the “Extra Info by Toolbox” text field for the Energy Toolbox. (The last commit of the repo should contain the config.txt file).
|
|
**Previous commits of the project should have been already analysed (R4)** using Static Energy Consumption Estimation tool in order for the service to retrieve them from the database. This is performed by placing {“commit”:commit-id} in the “Extra Info by Toolbox” text field for the Energy Toolbox. (The last commit of the repo should contain the config.txt file).
|